Send Message
Wuxi Grace Environmental Technology CO,.LTD
products
products
Home > products > DeNOx System > Tail Gas Treatment Unit Catalyst Tgtu Process Hazardous Waste Incineration

Tail Gas Treatment Unit Catalyst Tgtu Process Hazardous Waste Incineration

Product Details

Place of Origin: Jiangsu-China

Brand Name: Grace

Certification: ISO9001/ISO14001

Model Number: G-70049

Payment & Shipping Terms

Minimum Order Quantity: 1 pc

Price: $50000/pc-$200000/pc

Packaging Details: wooden box

Delivery Time: 10-30days

Payment Terms: T/T,

Supply Ability: 100PCs/per month

Get Best Price
High Light:

tail gas treating unit tgtu

,

tail gas treating unit catalyst

,

Tgtu tail gas treatment unit Process

Type:
Hazardous Waste Combustion NOx Control
Size:
Customers' Requests
Application:
Desulfurization
Product Name:
DeNOx System
Package:
Wooden Box,
Sample:
Available
Shipping Type:
By Sea, Air
Material:
Carbon Steel Plate
After-sales Service Provided:
Video Technical Support, Online Support, Spare Parts, Field Maint
Certification:
CE/ISO
Function:
Flue Gas Desulfurization Denitration
Air Volume::
2000-70000m^3/h
Type:
Hazardous Waste Combustion NOx Control
Size:
Customers' Requests
Application:
Desulfurization
Product Name:
DeNOx System
Package:
Wooden Box,
Sample:
Available
Shipping Type:
By Sea, Air
Material:
Carbon Steel Plate
After-sales Service Provided:
Video Technical Support, Online Support, Spare Parts, Field Maint
Certification:
CE/ISO
Function:
Flue Gas Desulfurization Denitration
Air Volume::
2000-70000m^3/h
Tail Gas Treatment Unit Catalyst Tgtu Process Hazardous Waste Incineration

Hazardous Waste Incineration Tail Gas Treatment System

 

 

 

Product Description

 

Characteristics of hazardous waste incineration tail gas treatment system:

 

1. Integrated design of denitration and denitration

2. It can tolerate extremely high concentration of nitrogen oxides

3. The flue gas temperature needs to be greater than 170℃, for example, if the flue gas contains sulfur dioxide and other substances, the heating capacity of the flue gas needs to be greater than 300%. According to the different dioxin concentrations in the flue gas, different bed design methods are adopted.

4. Denitrification efficiency > 95%, dioxin removal efficiency > 99.5%

5. The equipment is automatically controlled by PLC, free of manual operation and maintenance The annual operation cost is low

6. The overall volume of the system is smaller than that of the conventional system

7. The system has high resistance to dust, alkali metals and acidic substances.

8. The system has undergone rigorous flow field simulation test to ensure the highest catalyst efficiency

 

 

 

 

Company Information

 

 

Grace Environmental Protection Technology Co., Ltd. is a technical enterprise specialized in various types of exhaust gas treatment. The team has rich internal combustion engine exhaust gas and VOC treatment experience and more than ten years of working experience, and is a very few suppliers with the ability to design the whole process from catalyst to overall solution. At present, the products cover all kinds of exhaust catalysts, DOC,CDPF,SCR,ASC, etc. At the same time, they cover waste liquid treatment and indoor air purification, providing customers with the most competitive products and services. At present, the company has passed the certification of ISO14001 environmental management system, ISO9001 international quality certification, AAA enterprise credit rating and other certifications, and has an annual output of 500,000 litres of catalyst production coating line, complete quality management system and process control. Various performance testing capabilities, including SRD,SRF,ICP,BET, etc.!


Tail Gas Treatment Unit Catalyst Tgtu Process Hazardous Waste Incineration 0
 
 
 
 

FAQ

 

Q1. What is your terms of packing?
A: Generally, we pack our goods in neutral white boxes and brown cartons Or wooden cases and foam. If you have legally registered patent,
we can pack the goods in your branded boxes after getting your authorization letters.

Q2. What is your terms of payment?
A: T/T 30% as deposit, and 70% before delivery. We'll show you the photos of the products and packages
before you pay the balance.

Q3. What is your terms of delivery?
A: EXW, FOB, CRF, CIF, DDU.

Q4. How about your delivery time?
A: Generally, it will take 30 to 60 days after receiving your advance payment. The specific delivery time depends
on the items and the quantity of your order.

Q5. Can you produce according to the samples?
A: Yes, we can produce by your samples or technical drawings. We can build the molds and fixtures.

Q6. What is your sample policy?
A: We can supply the sample if we have ready parts in stock, but the customers have to pay the sample cost and
the courier cost.

Q7. Do you test all your goods before delivery?
A: Yes, we have 100% test before delivery

Q8: How do you make our business long-term and good relationship?
A: 1. We keep good quality and competitive price to ensure our customers benefit ;
2. We respect every customer as our friend and we sincerely do business and make friends with them,
no matter where they come from.